This site uses cookies. By using this website, you consent to the use of cookies. Detailed information

1-Lance tube cleaner

?
?

The operator positions the nozzle end against the tube to be cleaned. Air powered friction blocks within the hand held assembly deploy and retract the lance.

The deployment and retraction movements are?effected pneumatically.?

The speed of the deployment and retraction is controlled by an air regulator valve. The unit weighs in at only 8.5 kg and is supported by a shoulder strap

For lance o/d’s: 8 - 14 mm
Deployment/Retraction speeds: 0,3 - 0,65 m/s
Air pressure: 3,0 bis 6,3 bar?

Peinemann 1-Lance Tube Cleaner
?
?
?
LTC in action 1
LTC in action 2
LTC in action 3
?
vr网球 国内股票配资平台排名 公司股票的发行 10分快3是官方开奖 浙江体彩2o选5走势图 日本女优性爱图 江苏7位数历史开奖号码 追光娱乐下载安装 河南快3最新开奖结果 3分彩开奖软件下载 上海期货配资网 淄博凤阳大酒店小姐 辽宁35选7开奖号结果 乐禧白城麻将官网 u8棒球比分 江西11选五5任一怎么玩 大唐麻将下载