This site uses cookies. By using this website, you consent to the use of cookies. Detailed information

Quality control?

Quality according to regulations

?
?

Quality is predictable

Quality begins at the planning stage. Intensive material testing is an essential integral part of pump development. For instance crank sections are tested under full mechanical load using modern thermal imaging techniques to determine the areas of heat build up. The resultant data enables us to design the optimal pressurised lubrication system.

Hi-tech equipment?

Our quality control laboratory is fully equipped with the most Hi-tech equipment available. 3D systems to check measurement points or shape measurement systems work to an accuracy of thousandths of a millimetre. Laser engraving each component with a unique identifier contributes to the transparency of our quality control procedures.

Audited regulations?

Computer controlled work centres and modern manufacturing technology ensure constant dimensional accuracy.

All pumps and pump units are subjected to an extensive range of test procedures in our advanced test facility before delivery. Testing is carried out in accordance with current industry standards and regulations.

?
?
?
Thermal imaging in accordance with ATEX standards


Thermal imaging in accordance with ATEX standards

3D Measurement


3D Measurement

The 3D Measurement during a quality test


3D Measurement

?
?
?
Video measuring system


Video measuring system

Pressure test


Test facility

 Test facility


Test facility

?
vr网球 11选5前三组规律 河南快三最新开奖结果 足彩半全场 北京快中彩追号计划表 股票行情走势图 贵州嘛将下载 3d开奖号码结果查 中泽策略配资 大赢家比分足球比分即时比分.及时比分 福建快3下载 斗牛棋牌规则讲解 快3app客户端下载 3d开奖号今天 信富配资 手摸麻将技巧 辽宁风采35选7走势图